Your Estimating Hours Put a Ceiling on Sales
Every sales goal has a ceiling most owners never calculate. It's the number of hours your estimators have to bid.
The math on one estimator
Here's an example. One estimator has 1,500 bidding hours a year. At 30 hours a bid, that's 50 bids.
Say the average bid is $400,000. 50 bids is $20 million bid. Win one in five, and the company sells about $4 million.
That's the ceiling. Not the market. Not the crews. The estimating hours.
When the plan calls for more
If the plan calls for $6 million, something has to change. There are only a few ways to get there:
- More estimating hours. Hire, train or free up someone else to bid.
- Faster bids. Better tools, better history, a manual everyone follows.
- A better hit rate. Bid the work you're most likely to win.
Cutting price to win more is the other option. That one moves the profit number too, usually the wrong way. Read how markup decides the year in markup wins or loses.
I'd rather know the ceiling before I set the sales goal.
Do you bid everything?
Here's the other side of the same problem. How many bids did you send last year that you never had a real shot at?
Another example. 30 long-shot bids a year at 25 hours each is 750 hours of estimating. That's more than four months of one estimator's time.
Those hours could go to the jobs you fit best, the customers who pay on time and the work your crews do well. Or to checking last month's estimates against what the field actually did.
Bidding everything feels like staying busy. Choosing what to bid is a decision about where your profit comes from.
How to choose what to bid
When I ran my concrete company, the bids we lost the most were the ones we shouldn't have chased. A few questions help:
- Is this the kind of work our crews do best?
- Does this customer pay on time?
- Do we have a real relationship, or are we a number on a bid list?
- Will this job fit our schedule and our bonding?
- If we win it at this price, will it carry our overhead?
If most of the answers are no, the 25 hours are probably better spent somewhere else.
A manual makes every bid faster
One ROOI exam item reads: Estimators use our own estimating manual.
A manual is one way to make each bid faster and more consistent. It holds your production rates, your crew costs, your markup rules and the way your company builds a number. A new estimator can follow it. A veteran can stop rebuilding the same thing every time.
The best manuals are built from your own history. Rates the field actually earned, not book rates. That's where measuring labor against the estimate pays off. Read track the estimate to the last day.
Know the number first
Before you set next year's sales goal, figure out the ceiling. How many estimating hours do you really have? How long does a bid take? What's your hit rate? What's the average bid?
Then decide. Maybe the goal fits. Maybe you need another estimator. Maybe you need to stop bidding work you won't win.
The ROOI exam asks about your estimating manual and 19 other systems. You'll see your score against same-size firms, the pretax profit at stake each year in dollars and the first step to close each gap. The free planner after it helps you set a sales goal that fits.